Brushless Servo Motor Series 86BLS | ||||||
Design | 86BLS3A70 | 86BLS3A100 | 86BLS3A125 | |||
Specification | Unit | -B | -E | -E | -C | |
Rated voltage | U | V | 36 | 310 | 310 | 310 |
Rated out power | P out | W | 220 | 220 | 440 | 660 |
Rated speed | n N | rpm | 3000 | |||
Rated current | I N | A | seven.six | .eighty two | 1.65 | two.5 |
Rated torque | T N | N.m | .7 | .7 | one.four | two.one |
Peak current | I P | A | 21 | two | 5 | seven.six |
Peak torque | T p | N.m | 2 | two.two | four.5 | 5.one |
Voltage constant | K E | V/ Krpm | nine.one | 84 | eighty five | 85 |
Torque constant | K T | N.m/A | .093 | .eighty five | .nine | .ninety two |
Rotor inertia | J | Kg.cm 2 | .8 | .8 | one.6 | 2.four |
Number of poles | N P | 8 | eight | eight | 8 | |
Winding class | B | B | B | B | ||
Motor weight | Kg | one.85 | one.85 | 2.6 | three.ninety five | |
Remark | Motor are CZPT with different winding and mechanical modification to meet specific applications. | |||||
FAQ
Q: How to purchase?
A: send out us inquiry → receive our quotation → negotiate details → confirm the sample → sign contract/deposit → mass production → cargo ready → balance/supply → further cooperation.
Q: How about Sample purchase?
A: Sample is CZPT for you. please make contact with us for particulars.
Q: Which transport way is avaliable?
A: DHL, UPS, FedEx, TNT, EMS, China Submit,Sea are CZPT.The other delivery techniques are also CZPT, please get in touch with us if you need to have ship by the other delivery way.
Q: How prolonged is the produce?
A: Devliver time is dependent on the quantity you buy. generally it requires 15-25 operating days.
Q: My bundle has lacking items. What can I do?
A: Remember to get in touch with our help staff and we will affirm your get with the deal contents.We apologize for any inconveniences.
Q: How to verify the payment?
A: We acknowledge payment by T/T, PayPal, the other payment techniques also could be recognized,Make sure you speak to us ahead of you pay out by the other payment approaches. Also 30-fifty% deposit is CZPT, the stability funds ought to be compensated before delivery.